|
P
|
10/30/2026
| 0 | REMODELING OR ADDITION |
|
P
|
10/30/2026
| 0 | NICQ closed due to: Permit linked with completed structure |
|
P
|
10/30/2026
| 0 | REMODELING OR ADDITION-SMPR- REBUILD NEW 19 X 8 DECK AND 4 X 4 LANDING WITH STEPS TO GRADE |
|
P
|
10/09/2026
| 0 | Ownership change from straight transfer effective 10/9/2026 12:12 PM using WAR-WARRANTY-DEED Book/Page 010639-00260. REID 140947 transferred from grantor(s) PHILLIPS, ANNABELLE M to grantee(s) DREWS, CONNOR FREDERICK; DREWS, CHRISTINE |
|
P
|
2/04/2025
| 0 | NICQ closed due to: Permit linked with completed structure |
|
P
|
2/04/2025
| 0 | REMODELING OR ADDITION-SMPR: Encapsulate and seal all vents and perforations in the crawlspace. The existing insulation will remain in the floor system. A 20 amp GFCI outlet will be installed in the crawlspace for the dehumidifier. |
|
P
|
1/29/2025
| 0 | FOUNDATION REPAIR (100% FOR 2025) NO CHANGE IN VALUE |
|
P
|
1/01/2023
| 1 | POPE CROSSING/PH:1/LT#31 |
|
1
|
1/01/2023
| 2 | 480E-01-001 - |
|
1
|
4/30/2001
| 3 | COMMENTS => CORRECTED LISTING. |